Skip to main content

Sutter Health – Mills-Peninsula Medical Center Cath Lab II

Sutter Health’s Mills‑Peninsula Medical Center Cath Lab 2 project included a complete gut and full renovation to support high‑acuity cardiac and vascular diagnosis and intervention cases. At the center of the updated suite is the Philips Azurion 7 C20 FlexArm with ambient lighting, a ceiling‑mounted diagnostic system designed for flexible positioning, advanced imaging, and image‑guided navigation to support complex cases. The new room configuration emphasizes clinician visibility and efficient workflow through a multi‑monitor setup and a rotatable large‑format display.

The project scope included a complex seismic retrofit, overhead MEP coordination and upgrades spanning the Cath Lab procedure room and its connected control room. Surgical lighting, radiation shielding and seamless integration with existing hospital infrastructure were also incorporated to meet the demands of a critical care environment. The result is a high‑performance clinical space that strengthens the hospital’s ability to deliver interventional care with consistency, confidence, and long‑term durability.

Client

Sutter Health

Location
Burlingame, California
Architect/Engineer

Polytech

Boldt Role
General Contractor
Project Type
Renovation
Project Size
908 SF

MARKET
Healthcare

Project Highlights

  • 908 SF Cath Lab with new Philips Azurion with FlexArm diagnostic system
  • Complex seismic retrofit plus overhead MEP coordination
  • New dedicated battery backup 75 kVA Uninterruptible Power Supply (UPS)
  • Integrated surgical lighting, radiation shielding and ceiling LED light cove
  • Delivered in an operational OSHPD 1 facility